What to Do If Your Local Law 152 Inspection Results in a Gas Shut Off
The majority of Local Law 152 inspections return only minor issues. Considered deficient conditions, these will need repairs within 120 days of the inspection, but leave you with the flexibility to schedule those repairs without shutting off your gas service in the interim period. But on any occasion when an inspector finds hazardous conditions during […]
What to Do If Your Local Law 152 Inspection Results in a Gas Shut Off Read More »









